Historical crane on the redesigned original trestle bridge as a memorial of Gdansk Shipyard
The paper includes selected aspects of the study, whose goal is to hold the historical crane 642-24 in its current location after the modification of trestle bridge Wash Basin static scheme.The scope of the paper includes the assessment 2 Piece Dresser of current technical condition of the object, a presentation of FEM analyses, a description of th